  • „The design chosen for the cooling systems makes use of a direct fresh air cooling approach making use of freecooling and ambient favourable conditions
  • Our role was from strategic concept stages where we assisted locking in of the tenant, through all detailed design work stages to construction period with our commissioning
    management specialist company, Andrew Reid additionally appointed who, were in place to oversee all of the commissioning through the Integrated Systems Testing using a formal
    tagging process
  • The building has been designed to provide 18MW of IT load over a total technical space covering 6 data halls, Power density provided at circa 3500W/m2 load density
  • The overall PUE target at near full load is 1.2 or  less, for this hot aisle containment is essential to ensure segregation of the supply and exhaust air paths
  • The building is provided on a concurrently maintainable bases and has a single tenant occupancy