99 Bishopsgate Refurbishment

Logo
  • Refurbishment of 12,0000ft² office floors in the City of London, and return to Cat A (total building net area is 31,500m²).
  • The design is required to meet a 25% improvement on Part L 2010, EPC target is to improve on a C rating.
  • Air conditioning solution has been reviewed and agreed to remove the VAV system to podium level.
  • Chilled beam solution has been rejected and a new FCU installation proposed to all levels.
  • The site is located in a very sensitive area in the City of London.
  • BCO standards have been adopted to ensure the new space addresses the tenant market.
  • Tenancy split has been agreed on four tenants per floor, to reflect the client brief. Metering has been addressed in the same manner.