  • We worked on various large projects – Technical Building C 1, 9 and 10, Technical Building A 1 and 3 and the flight simulator hall (16 fixed-base units) in 2013 and 2014
  • The total project cost is estimated to be £35 million, which was delivered on time and to budget
  • Strip out of Technical Building C Level 10, old Variable Air Volume (VAV) fresh air systems replaced with three-pipe Variable Refrigerant Volume (VRV) heat recovery on 800m2 floorplate
  • 790 staff fully occupied Level 9 while construction work was in progress; once construction is complete, staff will move to Level 10 and Level 9 will be stripped and upgraded
  • Pilots from other airlines train at the 24-hour Simulator School on simulators for Boeing 737 and 787 Dreamliner and Airbus A380 aircraft which involved air conditioning in a listed aircraft hangar and new HV transformers in a live environment
  • BA wanted to consolidate simulators to free up space at the Cranebank site which housed 14 and is on the perimeter