TVP Campus Restack

Logo
  • Undertaking the role to prepare the Employer’s Requirements and remain as concept guardian for the MEP services for the refurbishment of Building 1 and Building 4
  • Works to Building 1 are a ‘light touch’ refurbishment
  • Work to building 4 includes a full replacement of the FCUs, and upgrade to the controls system to align with a new Trend head end
  • Within Building 4, the lighting is to be replaced with a ‘Redwood’ (PoE) lighting control system and LED luminaires
  • All works are to be undertaken with the surrounding floors of the buildings in occupation
Tweet about this on TwitterShare on LinkedInEmail this to someone

Our Portfolio