  • ƒConversion of an existing manufacturing facility to a new data centre of 2,700m² of white spacewith 4.0MW of IT capacity.
  • A bespoke design to meet the client’s specific requirements for N+1 resilience with dual paths. The electrical infrastructurewas designed on the basis of distributed redundancy.
  • A free cooling and partial free cooling system was designed that would operate in these forms in excess of 60% of the year.
  • ƒDesigns were completed to meet Netherlands regulations.