Sky Hub Refurbishment

Logo
  • ƒ“The Hub” building was completed for Sky in 2014. Since this time the staffing requirements have altered requiring staff numbers within the building to increase from circa 650 to 1,000. To achieve this large open sections of the floor are to be in filled and an additional mezzanine installed over level 2 in order to create a further 914m² of net area.
  • ƒApart from the structural changes which required a full re-analysis of the existing structure, significant increases in fresh air cooling and electrical capacity were required to be introduced whilst maintaining the BREEAM “Excellent” rating of the building.
  • ƒHurley Palmer Flatt are appointed as MEP, Structural, BREEAM, Acoustic and Fire Engineering consultants for the scheme which is due to complete November 2016.