  • The development consists of two highly resilient identical buildings each with an IT load of circa 6MW capacity, IT load based on 1500 Watts per square metre
  • The utility infrastructure consists of two 27 MVA supplies to the site each via two 33/11kV circuits, these are from alternative bulk primary sub-stations. Diverse A and B supplies are then routed to each data centre building
  • We were appointed as Lead Consultant responsible for the entire design team delivery, disciplines under remit as follows– electrical, mechanical, public health, fire, LEED/BREEAM assessors, CFD, PUE
  • The appointment is extended to our energy and sustainability departments who have been provided with a brief to obtain a LEED Gold/BREEAM Excellent ratings for the facilities and to provide renewable energy design solutions for a future on-site location.