55-56 St James’s St, London

Logo
  • Completion date (construction): August 2015. The development consists of a seven storey building plus two basement levels incorporating B1 office and C3 residential. Planning authority: City of Westminster.
  • Ventilation: AHU located on roof level will supply the fresh air requirement for the offices.
  • Heating and cooling: Heating to be provided by Under Floor Heating served by heat pump boiler to all areas of the apartment except the bathroom which is served by a towel rail (also supplied via heat pump boiler). Cooling to the apartment to be provided via VRF units to living area and bedroom only.
  • Domestic hot water: Domestic hot water to be provided by solar hot water collectors and VRF heat pump boiler. There will also be a life safety generator located on the roof. BREEAM ‘Very Good’.