  • Hurley Palmer Flatt undertook a detailed condition of the existing services at Brindley Place to determine the likely risk of failure during a lease extension period.
  • Following the issue of the condition report the team undertook the detailed design of the engineering system replacement works, the required enabling works to facilitate the design scheme and tendered the package successfully.